Service & Parts: Keeping the Robots and PLCs You Already Have Running
We keep the robots and PLCs already in your plant running. When a line stops, we provide 24/7 breakdown support. To keep it from stopping, we carry out preventive maintenance, supply spare parts and repair robot boards and drives in-house.

If a robot or machine has stopped on an alarm, call us 24/7: +90 533 268 32 34. We put response time and service area in writing in the service agreement.
Have this ready when you call, so diagnosis starts on the phone and the technician arrives prepared:
- Robot make and model: from the label on the arm, e.g. ABB IRB 2600 or KUKA KR 16
- Controller type: e.g. ABB IRC5 or KUKA KR C4
- Serial number: from the labels on the robot and the controller cabinet
- Alarm or error code: the number and full text, with a photo of the teach pendant screen
- What happened just before the stop: a collision, a power cut, a program change, maintenance or work inside the cabinet
- For a PLC fault: the PLC model, the LED status on the CPU and where the latest program backup is kept
You can send photos to satis@piot.com.tr.
Robot maintenance
Robot maintenanceOur preventive robot maintenance covers more than 30 check points: gearbox oil, backup batteries, the dress pack, brakes, controller fans, program backups. Worn parts get replaced during a stop you choose, not in the middle of production.
Robot spare parts
Robot spare partsWe supply new and used robot spare parts with warranty for ABB, KUKA and other brands: from FlexPendant and smartPAD components to cabinet boards, motors and drives.
Board and drive repair
Board and drive repairWe repair and test controller boards, drives and teach pendants in-house. Board and drive repair gets a robot running again when the new part is expensive, slow to arrive or no longer made.
PLC, HMI and SCADA support
PLC / SCADA supportOur 24/7 PLC and SCADA support covers machines stopped by a PLC, operator panel or SCADA fault. As a Siemens partner we work with SIMATIC systems.
Robot cell relocation
Robot cell relocationFor robot cell relocation, we plan dismantling, transport, re-assembly, axis recalibration and recommissioning as one job.
Installation and commissioning
Installation and commissioningWe install cells, fixtures and conveyors on site and connect them to your line. Installation and commissioning is planned around ongoing production.
Maintenance contracts
For plants with several robots or a critical line, a maintenance contract settles what happens in a breakdown before the breakdown. Visits are planned around your shutdown windows, critical spare parts are listed in advance and program backups are kept current.
Why these belong together
A stopped robot is usually a diagnosis, a part and a maintenance question at once. The team that finds the faulty board repairs it and checks the root cause at the next service visit. One team knows your machines' history, so you don't explain it again with every breakdown.
Related pages
- PLC migration (S5 / S7-300)SIMATIC S5 and S7-300 migration to S7-1500: program, panel, HMI and drives are prepared in advance so the switch-over fits a planned shutdown window.Go to page
- Used robot integrationWe inspect, integrate and commission used industrial robots and supply warranted ABB and KUKA parts. Lower investment, with the risks seen before you buy.Go to page
Is your line down?
Call us with the robot or PLC model and the error code, and we'll start the diagnosis on the phone.